Jump to content
Search In
  • More options...
Find results that contain...
Find results in...

When is the nda lifted for benchmarks of the new rtx series?

All in the title. 

Just wondering. 

Intel i5-7600K  | Cooler Master Hyper 212 Evo  |  MSI H110 PC MATE  |  2x8GB Crucial Ballistix LT Sport 2400MHz  | MSI GTX 1080 ti Gaming X 11GB Radeon HD 7770 1GBDark Base Pro 900 (Orange)  | Toshiba 250GB 2.5" Drive -Game Drive | Crucial MX200 250GB 2.5" SSD - Boot Drive |  

 

Living Room PC: AMD Ryzen 2400G | VEGA 11 | ASUS P106-100 6GB V1 | 2x8 GB Crucial Ballistix 2400MHz | Samsung 120GB SSD | Seagate 500 GB HDD | Node 202 + 450W PSU |

Link to post
Share on other sites
Just now, Edgar R. Zakarian said:

All in the title. 

Just wondering. 

Hopefully by tomorrow, or maybe later today.
Nvidia generally gives a few days to make sure all the reviewers get their cards and are done testing.

I will recommend an NHu12s (or an NHd15 (maybe)) for your PC build. Quote or @ me @Prodigy_Smit for me to see your replies.

PSU Teir List | Howdy! A Windows Hello Alternative 

 

 

Laptop :

Legion y520 | i5 7300hq | 1050 4gb (Manual OC) | 16gb 2400Mhz cl18 | 256 GB SSD | 2tb HDD

Server:

Xeon E3 1245 | 16gb ECC ram | 256 GB SSD | 2*2tb HDD

Link to post
Share on other sites
3 minutes ago, Smit Devrukhkar said:

Hopefully by tomorrow, or maybe later today.
Nvidia generally gives a few days to make sure all the reviewers get their cards and are done testing.

So there isn't a specific date, like 2 weeks after official announcement or on the release date where items hit the shelves ? 

Like some standard

Intel i5-7600K  | Cooler Master Hyper 212 Evo  |  MSI H110 PC MATE  |  2x8GB Crucial Ballistix LT Sport 2400MHz  | MSI GTX 1080 ti Gaming X 11GB Radeon HD 7770 1GBDark Base Pro 900 (Orange)  | Toshiba 250GB 2.5" Drive -Game Drive | Crucial MX200 250GB 2.5" SSD - Boot Drive |  

 

Living Room PC: AMD Ryzen 2400G | VEGA 11 | ASUS P106-100 6GB V1 | 2x8 GB Crucial Ballistix 2400MHz | Samsung 120GB SSD | Seagate 500 GB HDD | Node 202 + 450W PSU |

Link to post
Share on other sites
8 minutes ago, Edgar R. Zakarian said:

So there isn't a specific date, like 2 weeks after official announcement or on the release date where items hit the shelves ? 

Like some standard

Nah. Just wait.

Main Rig :

Ryzen 7 2700X | Powercolor Red Devil RX 580 8 GB | Gigabyte AB350M Gaming 3 | 16 GB TeamGroup Elite 2400MHz | Samsung 750 EVO 240 GB | HGST 7200 RPM 1 TB | Seasonic M12II EVO | CoolerMaster Q300L | Dell U2518D | Dell P2217H | 

 

Laptop :

Thinkpad X230 | i5 3320M | 8 GB DDR3 | V-Gen 128 GB SSD |

Link to post
Share on other sites

14th is when the NDA starts to lift. I don't know if that's a full lift. Nvidia could have a phased release of various aspects.

 

Maybe they'll allow gameplay video but no metrics

Or just thermals

 

But the 14th is a date I've heard. 

No I can't state my source as the date of NDA lift might be part of the NDA and I don't want to get the guy into trouble. It was mentioned deep in a discussion thread on another forum. 

Link to post
Share on other sites

14th for Founders Edition cards, 17th for AIB cards. At least that's the case for the 3080; the 3070 and 3090 might be at a later date, I'm not sure.

Desktop: Intel Core i9-9900K | be quiet! Dark Rock Pro 4 | ASUS Strix Z390-F | G.Skill Trident Z Neo 2x16GB 3200MHz CL14 | EVGA GeForce RTX 2070 SUPER XC Ultra | Corsair RM650x | Fractal Design Define R6

Laptop: 2018 Apple MacBook Pro 13"  --  i5-8259U | 8GB LPDDR3 | 512GB NVMe | macOS Big Sur

Peripherals: Leopold FC660C w/ Topre Silent 45g | Logitech MX Master 3 & Razer Basilisk X HyperSpeed | Beyerdynamic Custom One Pro Plus | Audio-Technica AT2020USB+

Displays: Alienware AW2521HF & BenQ BL2420PT

Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×